did f.line, plumbed pump, rubber/ detail trim in engine, new cables, installed fuel tank. engine finnish up and prep for install on sun.
kevin
Attached image(s)
firewall.
Attached image(s)
cb fuel pump, small canister in front is the regulator. not ness the final elevation. petcock is to shut off the gas when changing fuel filter. it comes from pp along with the rubber engine bar mounts and a speedo drive cable tomorrow. that's it for needs now.
Attached image(s)
drivers side.
kevin
Attached image(s)
Looks great Kevin. This winter, Im going to drop my engine, and do everything that I should have done while the engine was out last winter
Looks good! Is that rattle can paint or real spray on stuff?
Geoff
i've thought about it. rattle can, custom mixed at canyon auto body. so does that make it the real stuff in a rattle can? chris, you mean next winter. it's only may.
kevin
Silver is always a great color. Nice work... I'm more impressed with each group of pictures you post.
-Rusty
Yes, next winter, this coming winter, hibernation time................
Powered by Invision Power Board (http://www.invisionboard.com)
© Invision Power Services (http://www.invisionpower.com)