okay to get it started i need to do the following:
find the mas and plug it in 1 min
make and hook up a starter cable 30 mins
hook up the fuel lines ( 2 12 inch pieces ) 5 mins
hook up the pwr to the brain 5 mins
hook up 2 grounds 2 mins
to get it on the road
install radiator and hoses ( 2 bolts ) 20 mins
fill tranny ( swepco waiting ) 20 mins
install reverse switch and hook up 10 mins
install angle drive and hook up speedo cable 10 mins
hook up clutch 15 mins
throttle cable maybe 1 hour
modify shift bar and install 2 hours
bolt up cv joints 10 mins
loop heater water lines and replace one undernieth 20 mins
install exaust and put a muffler on it ?
finish welding the body motor mounts ?
make a speed sensor for suby brain 2 hours
Good luck. That's a lot for one day.
i just want to get it started before i begin the second part. i think with as much time i have been spending on the car its a week away from being driven, not fully on the road but being driven
QUOTE (scott thacher @ Feb 22 2005, 11:07 PM) |
i just want to get it started before i begin the second part. i think with as much time i have been spending on the car its a week away from being driven, not fully on the road but being driven |
QUOTE (914RS @ Feb 22 2005, 10:30 PM) |
Let's race (mechanically). We both need time on the road prior to WCC. |
QUOTE (scott thacher @ Feb 22 2005, 11:34 PM) | ||
if we both make it to the WCC we can race both ways |
QUOTE (914RS @ Feb 22 2005, 10:37 PM) |
What do you mean 'if'? You're my only guest so far. Come on, I'm counting on you.. |
Every time I draw out a schedule, I forget to unplug the phone and all my buddies decide to stop by!
Good Luck!
good luck scott! i hope all goes well!
Attached image(s)
Uhh.... everyone is behind you..
RUN!
M
QUOTE (scott thacher @ Feb 22 2005, 09:18 PM) |
okay to get it started i need to do the following: find the mas and plug it in 1 min make and hook up a starter cable 30 mins hook up the fuel lines ( 2 12 inch pieces ) 5 mins hook up the pwr to the brain 5 mins hook up 2 grounds 2 mins to get it on the road install radiator and hoses ( 2 bolts ) 20 mins fill tranny ( swepco waiting ) 20 mins install reverse switch and hook up 10 mins install angle drive and hook up speedo cable 10 mins hook up clutch 15 mins throttle cable maybe 1 hour modify shift bar and install 2 hours bolt up cv joints 10 mins loop heater water lines and replace one undernieth 20 mins install exaust and put a muffler on it ? finish welding the body motor mounts ? make a speed sensor for suby brain 2 hours |
QUOTE (riverman @ Feb 23 2005, 06:26 AM) |
[ "Whatever time I say I'm going to be done - add on an hour." With that list, there's a lot of things that won't go as smoothly as you think. Good luck! |
Good luck!
Powered by Invision Power Board (http://www.invisionboard.com)
© Invision Power Services (http://www.invisionpower.com)