Printable version of Entry

Click here to view this entry in its original format

John's BLOG

04-30-2006

04-30-2006

Installed the backpad, bolted the DME to the floor, and finished up the fuel line routing in the engine comp.


Attached thumbnail(s)
Attached Image Attached Image Attached Image

Powered by Invision Community Blog (http://www.invisionblog.com)
© Invision Power Services (http://www.invisionpower.com)