Printable version of Entry

Click here to view this entry in its original format

John's BLOG

06-29 to 07-08-2006

06-29 to 07-08 2006

I was busy completing my checklist and took no pictures, but I:

Painted and installed the shift rod
Installed my interior (less accelerator pedal, driver seat, driver carpet)
Installed my rebuilt 19mm master cylinder
Plumbed and blead my brakes
Packed and installed my 911 CV joints on 914-6 axle shafts
Filled the transmission with gear lube
filled the oil tank with oil
Installed a new battery in the marine case up front
Installed the throttle cable (914-4) and set up my custom linkage
Fabricated and installed a relocated AFM bracket to keep the original engine lid latch
Painted the bellypan of the car (POR-15 and Rustoleum)
Re-bled the brakes (those rear proportioning valves trap air)
Installed starter and terminated the starter wiring
Terminated the Backup light switch wires

Basically I got the car ready to fire up.

Powered by Invision Community Blog (http://www.invisionblog.com)
© Invision Power Services (http://www.invisionpower.com)