|
|

|
Porsche, and the Porsche crest are registered trademarks of Dr. Ing. h.c. F. Porsche AG.
This site is not affiliated with Porsche in any way. Its only purpose is to provide an online forum for car enthusiasts. All other trademarks are property of their respective owners. |
|
|
| shuie |
Nov 6 2011, 02:21 PM
Post
#1
|
|
Member ![]() ![]() Group: Members Posts: 352 Joined: 17-May 04 From: baton rouge, la Member No.: 2,075 |
Rust is so weird. The outer longs, suspension consoles, and hellhole in my car are rock steady, but my floors have rusted from the inside out and are completely shot.
Here's a pic of the DS. I thought I might be able to save some of this, so I pulled the sound deadener up and found it was rusting from the inside out. I didnt bother getting pics of the passenger side. It was pretty obvious it was gone once I started poking around. (IMG:https://lh6.googleusercontent.com/-EFzWlIxugUI/TraPcBRbKdI/AAAAAAAAKH0/tJROzhoMIsc/s800/IMG_0141.jpg) I need to replace the entire floorpan. Both crossmembers need to be replaced as well as the triangles with the jacking donuts. I will also be doing some patch work around the perimeter of the floor, inner longs, around the center tunnel, etc.. What is the best strategy for this kind of job? I know I need to brace the doors before I start cutting. Whats the best way to keep the tub supported properly and NOT remove too much metal at one time? Should I leave most the floorpan in place along the center tunnel section and do the patchwork along the inner longs and perimeter of the floors first? For the replacement panels, does it make more sense to use the front and rear halves, or the left and right halves on a job like this? And, how bad of a job is this without a rotisserie? I don't know enough about these cars to know how the different layers of the metal get sandwiched together in the floor area yet. Can I weld the floor pans in from the top, from inside the passenger compartment? Or, will I have to weld overhead? TIA. |
![]() ![]() |
| MrHyde |
Nov 7 2011, 12:06 AM
Post
#2
|
|
Senior Member ![]() ![]() ![]() Group: Members Posts: 525 Joined: 13-October 10 From: Ontario, Canada Member No.: 12,268 Region Association: None |
I'm in the middle of welding in the rear floor pan in my 914 right now... on Jack stands... Aggravating, but I don't have the room for a rotisserie... 3-4 spot welds/stich's then get up move everything over to another side of the car and do a few more, etc.. Almost have the welds on the longs and rear firewall done, then I ran out of gas.... Just as well. Welding on your back hurts..
|
shuie floorpan replacement process Nov 6 2011, 02:21 PM
scotty b It;s a PITA without a rotisserie, reason being all... Nov 6 2011, 07:33 PM
jimkelly a nice pic here
http://www.914world.com/bbs2/inde... Nov 7 2011, 06:07 AM
shuie Thanks guys. The pics in the linked thread definit... Nov 7 2011, 07:55 PM
shuie As much as I want to build one, I dont think have ... Nov 12 2011, 10:23 AM
Vysoc Ironic,
I am doing the same thing you are and aft... Nov 12 2011, 01:36 PM
shuie
I have the room and have decided to build a rotis... Nov 12 2011, 05:59 PM
mikea100 You can easily fabricate your own using readily av... Nov 13 2011, 05:06 PM
Vysoc Great Advice Thank you for the pictures, I am work... Nov 13 2011, 08:29 PM![]() ![]() |
|
Lo-Fi Version | Time is now: 4th April 2026 - 07:03 AM |
| All rights reserved 914World.com © since 2002 |
|
914World.com is the fastest growing online 914 community! We have it all, classifieds, events, forums, vendors, parts, autocross, racing, technical articles, events calendar, newsletter, restoration, gallery, archives, history and more for your Porsche 914 ... |