Welding partial bottom piece at the rear |
|
Porsche, and the Porsche crest are registered trademarks of Dr. Ing. h.c. F. Porsche AG.
This site is not affiliated with Porsche in any way. Its only purpose is to provide an online forum for car enthusiasts. All other trademarks are property of their respective owners. |
|
Welding partial bottom piece at the rear |
Leon.paradise |
May 16 2021, 04:10 PM
Post
#1
|
Newbie Group: Members Posts: 10 Joined: 30-December 19 From: Munich Member No.: 23,780 Region Association: None |
Hello,
I would like to replace and weld in part of the floor panel at the rear of my 914. I have a question to which I have not found an answer on the Internet. When I weld in the floor pan I have to completely remove the 2 plastic fuel lines (flow and return) from the tunnel or I can leave them in when welding the floor pan. I am specifically concerned with the risk of fire. The heat when welding sheet metal can cause the fuel lines to melt or the heat to make the lines so hot that what can happen. The engine and tank are still installed in the vehicle as normal. What about the engine and tank, can they be built in or do they have to be removed before I start welding. The carpet, seats, seat back wall will of course be removed by me beforehand. Pictures of the area Greetings Leon |
Lo-Fi Version | Time is now: 31st October 2024 - 05:17 PM |
All rights reserved 914World.com © since 2002 |
914World.com is the fastest growing online 914 community! We have it all, classifieds, events, forums, vendors, parts, autocross, racing, technical articles, events calendar, newsletter, restoration, gallery, archives, history and more for your Porsche 914 ... |