Home  |  Forums  |  914 Info  |  Blogs
 
914World.com - The fastest growing online 914 community!
 
Porsche, and the Porsche crest are registered trademarks of Dr. Ing. h.c. F. Porsche AG. This site is not affiliated with Porsche in any way.
Its only purpose is to provide an online forum for car enthusiasts. All other trademarks are property of their respective owners.
 

Welcome Guest ( Log In | Register )

 
Reply to this topicStart new topic
> JWest Linkage DYI Question, The rear linkage welding?
Larouex
post May 15 2010, 11:46 PM
Post #1


Larouex
**

Group: Members
Posts: 144
Joined: 22-July 08
From: Larouex@gmail.com
Member No.: 9,339
Region Association: Pacific Northwest



I am in the last phase of my JWest conversion of linkage and Rennshift shifter. I have looked over all the threads I could find and have a question...

The rear linkage uses 2 inserts into the U-Joints and the instructions say to use the modified tube from the linkage and cut and weld it. Okay that is fine, I get it. But the slop in the tube versus the pieces to weld is pretty significant.

How have you all handled that? Shimmed it, added some material, etc?

Any insight would be appreciated.

Cheers,
Larouex
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
ejm
post May 16 2010, 04:44 AM
Post #2


I can see the light at the end of the tunnel
****

Group: Members
Posts: 2,704
Joined: 3-February 03
From: Massachusetts
Member No.: 224
Region Association: None



I made a split sleeve from thin wall tubing. Besides welding at the end of the tube I drilled the tube and sleeve close to the inner end of the spine insert and did a couple of plug welds.
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
JWest
post May 16 2010, 07:29 AM
Post #3


Senior Member
***

Group: Members
Posts: 1,662
Joined: 6-January 03
From: Fort Worth, TX
Member No.: 97
Region Association: None



QUOTE(Larouex @ May 16 2010, 12:46 AM) *

I am in the last phase of my JWest conversion of linkage and Rennshift shifter. I have looked over all the threads I could find and have a question...

The rear linkage uses 2 inserts into the U-Joints and the instructions say to use the modified tube from the linkage and cut and weld it. Okay that is fine, I get it. But the slop in the tube versus the pieces to weld is pretty significant.

How have you all handled that? Shimmed it, added some material, etc?

Any insight would be appreciated.

Cheers,
Larouex


The tube and splined end typically meet at a significant angle, so the slop is actually welcome for allowing initial setup and alignment (must be done on the car due to the angles required). If the tube and end were the same size, they could only be assembled on-axis, and would not align with the u-joints when the joints are attached to the other linkage on the car.

Once the tube is tacked to the ends on the car, remove and split/form the tubing to fit well, or just build up weld to fill the gap on the solid end until it meets the thin tube.
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
Larouex
post May 16 2010, 09:24 AM
Post #4


Larouex
**

Group: Members
Posts: 144
Joined: 22-July 08
From: Larouex@gmail.com
Member No.: 9,339
Region Association: Pacific Northwest



Thanks for the explanation James. I know what to do now.

Larouex
User is offlineProfile CardPM
Go to the top of the page
+Quote Post

Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



- Lo-Fi Version Time is now: 8th December 2024 - 09:35 PM