We reached the cleanup & patch phase.
Today, we removed the mid section of the center tunnel. It'll be replaced with a custom (removable) version. It'll be nice to be able to access everything inside the tunnel in the center section of the car.
We'll have to run all custom cables, wires and fuel-lines etc.. The new tunnel will be narrower and lower than the stock tunnel.
We also patched the sides of the floorpan. The mid-section requires some creative metal bending. We'll add that next weekend.
The rest of the day was spent cleaning up and prepping the side sections around the inside of the targa bar to door post transition.
That part will also be patched in next weekend.
And here are the pix: