ellisor3
Mar 20 2010, 06:22 PM
I dropped my engine out today to do an EFI conversion, I have a 6, and starting thinking that I should do as many projects as possible while I have this big whole. Here is what I have so far, what else am I missing?
Check/replace clutch if necessary
Take care of rust in the engine bay
Paint the engine bay
Inspect and replace motor mounts
Install MSD unit
Ceramic coat the exhaust
Powder coat the valve covers
Blast the transmission/engine
Inspect/replace weather strip
r_towle
Mar 20 2010, 06:49 PM
Get the inner suspension ears all up to snuff.
Rear suspension bearings
Rich
championgt1
Mar 20 2010, 09:37 PM
SS fuel lines.
Mark Henry
Mar 20 2010, 09:42 PM
Drain wallet.
Cairo94507
Mar 21 2010, 07:32 AM
QUOTE(Mark Henry @ Mar 20 2010, 08:42 PM)
Drain wallet.
That made me laugh.
ellisor3
Mar 21 2010, 07:49 AM
QUOTE(Mark Henry @ Mar 20 2010, 11:42 PM)
Drain wallet.
That was project #1, happened a long time ago.
Joe Bob
Mar 21 2010, 12:00 PM
Tranny bushings, swing arm bushings..........
Krieger
Mar 21 2010, 12:08 PM
Carrera tensioners. Trans mounts upgrade to 911 sport engine mounts.
URY914
Mar 21 2010, 12:20 PM
Replace with larger engine
ellisor3
Mar 21 2010, 03:05 PM
Thanks guys, I think I have everything on the list.
Have a 3.0/3.2 going in, cash going out.
jt914-6
Mar 21 2010, 03:47 PM
Cut out access panel for alt. belt???
Click to view attachment
This is a "lo-fi" version of our main content. To view the full version with more information, formatting and images, please
click here.