I'm not feeling too optimistic at this point.
I've got the front 5 lug done, new calipers arrived, waiting for hardware from GRP to put them back together.
Rears are apart, need to clean the trailing arm and insert bearings and hubs then rotors, new pads in calipers and speed bleeders then the rears are done.
Waiting on some sway bar bushings and the rear bar will be done.
Need to grow some balls and take the tank out and put the front bar in.
THEN...I still have the engine to deal with...I'm really nervous about doing it now. I know, I'm a chicken. I finally have all the parts, except the heads which are at EBS. I am missing the seals, compounds and what not to seal and adhere the pieces together correctly.
Trans...I hope I have all the pieces for the conversion...need to send the shifter back to James to convert it to side shift as well.
Door handles don't work now either, Dave from GRP is sending along some repair kits with the bushings for the rear bar.
I'm afraid I may not make it.