My door latches are installed, but I otherwise have un-populated doors. I'm soliciting tips on installing all the door window hardware, specifically the vent window, window tracks, and regulator. Mainly, I need to know the best sequence of installing everything.
I put new fuzzies in the aluminum channel, and fastened the outer door fuzzy. Someone told me you can drop the window in first with the regulator laying loosely at the bottom of the door, but the window will not go down far enough to attacth the outer fuzzy afterward.
Any suggestions or link would be greatly appreciated.
Andys