The amount of time my car has sat is getting very silly.
I need some folks to come over and motivate me / help me get my engine finished and back on the road.
I think the car needs ~2 days of work before it fires and tuning starts in earnest.
You tell me what day you can come over. You can pick a weekend day between now and March 2014. If I am free or can get free I'll say yes. I will buy you beer and feed you. You will help me work and keep me motivated.
Unless I'm hunting or have obligated myself to help someone else, I'll do what I can to free myself up.
Punchlist (somewhat in order):
attach 4 way CHT sendersattach tooth timing ring and timing senderinstall dizzy cover- attach harness wire to timing sender
- Attach tins and doghouse
- attach coil on plug (COP) brackets
- Remove engine from stand and place on install trolly.
- attach COPs
- attach plenum and intake runners
- attach wire harness
- attach airbox
- install new HP fuel hose
- install pump, filter
- install gas tank, wiring
- install engine shelf SS fuel lines
- install Tangerine shift kit bushing
- modify trans console ear for Tangerine shift kit
- mate engine to transmission on install trolly
- install engine into the car
- install SSI exchangers, muffler
- install 02 sender and harness
- Install Tangerine shift bar
- Hook up oil cooler wires (reroute as needed)
- Hook up axles
- figure out what I'm missing with the Microsquirt setup.....
- new brake pads on all corners
- fresh fluid and bleed brakes
- OIL
- gas
- start it up!
Thanks!
Zach