this went missing after the WCC in LA....today I found it...
I will take it over to my supplier to have the Durometer hardness testing done (I really should invest in my own but they are about $1000) and pick up some materials tomorrow. Then I have to cast a internal mold of it. Then split it into two and cast a top and bottom of both halfs. If everything goes well the first one should be ready by Saturday. Being a small item I should make several molds so I can mix a average batch of material to make a few at a time.
Attached thumbnail(s)