Home  |  News  |  Forums  |  FAQ  |  Classifieds  |  Events  |  914 Info  |  Blog  |  Members Map
IPB
 
 
 
 
 

Welcome Guest ( Log In | Register )

 

5 Pages V < 1 2 3 4 5 >
entry Jun 1 2006, 08:25 PM
05-20-2006

I installed the front hubs on the struts. I'm waiting for tie rod ends and a 19mm MC rebuild kit to complete the front end. I bolted one of my cookie cutters on to see what it will look like before I flare the car. I must repaint the wheels....

Attached thumbnail(s)
Attached Image Attached Image Attached Image

entry Jun 1 2006, 08:16 PM
05-19-2006

I installed my 911 front struts.

They were the right price. It's surprising how well John Deere Green matched Bilstein Green....

Attached thumbnail(s)
Attached Image Attached Image

entry Jun 1 2006, 08:06 PM
05-14-2006

I worked at finishing up the front trunk. I re-installed the felt, I installed the oil tank, the tank breather, the thermostat, the cooler and it's powder coated shroud, the battery box, the fuel pump, fuel lines, and gas tank.

I began work on my steel fron valance panel to trim it out similar to a GT valance, but kept it mostly stock shaped. (sorry no pics yet).

I am using an early chrome front bumper and if I can get my rear rubber top off my rear bumper, I'll use an early chrome rear bumper.

Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image Attached Image

entry Jun 1 2006, 07:57 PM
05-11-2006

Touched up welds and cuts with POR and then gray topcoat. I also added a stainless mesh screen to protect the oil cooler from flying debris. I wasn't taking that many pics as the BLOGS were down....

Attached thumbnail(s)
Attached Image Attached Image

entry Jun 1 2006, 07:52 PM
05-09-2006

Finished welding in the front trunk.

my mounts for the oil tank, oil tank breather, and thermostat are all in place. My cutout for the cooler is also done.

Attached thumbnail(s)
Attached Image

entry Jun 1 2006, 07:47 PM
05-03-2006

Fabricated the oil tank mount, started laying out my vented rear rotors with rear 911 calipers and e-brakes, and welded the oil tank bracket in place.

Attached thumbnail(s)
Attached Image Attached Image Attached Image

entry Jun 1 2006, 07:42 PM
04-30-2006

Installed the backpad, bolted the DME to the floor, and finished up the fuel line routing in the engine comp.

Attached thumbnail(s)
Attached Image Attached Image Attached Image

entry Jun 1 2006, 07:24 PM
04-29-2006

I located and mounted my fuel filter, ran a hard line to it from the stainless lines, and worked some more on my oil cooler shroud.

Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image

entry Jun 1 2006, 07:17 PM
04-26-2006

I worked at srtaightening out my wiring harness in the engine comp, ran my stainless fuel lines, installed my inside sound insulation pad and finalized the location of my DME box.

Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image

entry Jun 1 2006, 07:15 PM
04-25-2006

I turned the cardboard pattern into metal by MAGIC.

Attached thumbnail(s)
Attached Image

5 Pages V < 1 2 3 4 5 >