|
|
Day 2 (Sunday 02-19)
I drained and removed the fuel tank, cleaned up the front trunk area, and started removing interior items. I will be installing stainless fuel lines through the tunnel, relocating the battery to the front, installing my oil tank up front, and adding an oil cooler up front as well. I will also try getting my 5-lug suspension in this winter as well. If time permits, the flares will go on as well. A full repaint will happen sometime in the future after all cutting,welding, fabricating is completely tested and proven... Attached thumbnail(s) ![]() ![]() ![]() ![]() ![]()
|