|
|
06-29 to 07-08 2006 I was busy completing my checklist and took no pictures, but I: Painted and installed the shift rod Installed my interior (less accelerator pedal, driver seat, driver carpet) Installed my rebuilt 19mm master cylinder Plumbed and blead my brakes Packed and installed my 911 CV joints on 914-6 axle shafts Filled the transmission with gear lube filled the oil tank with oil Installed a new battery in the marine case up front Installed the throttle cable (914-4) and set up my custom linkage Fabricated and installed a relocated AFM bracket to keep the original engine lid latch Painted the bellypan of the car (POR-15 and Rustoleum) Re-bled the brakes (those rear proportioning valves trap air) Installed starter and terminated the starter wiring Terminated the Backup light switch wires Basically I got the car ready to fire up.
|