Home  |  Forums  |  914 Info  |  Blogs
 
914World.com - The fastest growing online 914 community!
 
Porsche, and the Porsche crest are registered trademarks of Dr. Ing. h.c. F. Porsche AG. This site is not affiliated with Porsche in any way.
Its only purpose is to provide an online forum for car enthusiasts. All other trademarks are property of their respective owners.
 

Welcome Guest ( Log In | Register )

> scca IT cage rules question, Will it pass tech?
94teener2
post Nov 20 2005, 03:25 PM
Post #1


Newbie
*

Group: Members
Posts: 40
Joined: 2-October 05
From: livermore,ca
Member No.: 4,903




Putting in a cage for SCCA IT racing. Got main hoop to top of rockers (longs?). Am in process of putting in forward bar from main hoop to A pillar to either floor or top of rocker. Much prefer top of rock but the rules state to "floor"(gcr 18.3.c).

Anyone have any experience passing tech (getting logbook) with down tubes mounted to top of the rockers.

thanks
andy
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
 
Reply to this topicStart new topic
Replies
HotRod
post Nov 21 2005, 01:23 PM
Post #2


Member
**

Group: Members
Posts: 56
Joined: 13-January 03
From: Burke, Virginia
Member No.: 142



Do not go to the floor! Go to the top of the rocker. I believe that you have to have a reinforcment of a certian thickness and size (8 inches I think) if you go to the floor. The rocker provides a much more solid place to support both the rear main hoop and the front down tubes (the ones that go along the A pillar). In IT, if I remeber correctly, you can only have 6 mounting points.

Why IT? I would (and did) go production, I started in E Prod then moved to F when the changed the classification for the 1.8.
User is offlineProfile CardPM
Go to the top of the page
+Quote Post

Posts in this topic


Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



- Lo-Fi Version Time is now: 17th June 2024 - 04:19 AM