Home  |  Forums  |  914 Info  |  Blogs
 
914World.com - The fastest growing online 914 community!
 
Porsche, and the Porsche crest are registered trademarks of Dr. Ing. h.c. F. Porsche AG. This site is not affiliated with Porsche in any way.
Its only purpose is to provide an online forum for car enthusiasts. All other trademarks are property of their respective owners.
 

Welcome Guest ( Log In | Register )

> Must do before the motor goes in?, A checklist before Dwayne arrives
Kansas 914
post Nov 25 2009, 08:34 AM
Post #1


Advanced Member
****

Group: Members
Posts: 2,999
Joined: 1-March 03
From: Durango, Colorado
Member No.: 373
Region Association: Rocky Mountains



All,

What would you like to see done before Dwayne stuffs the powerplant in the car?

SS fuel lines are already in - firewall to firewall
Shift rod is in place
Engine tin is painted - Dwayne did that for Mary
Dwayne will install the new engine bay rubber that Mary bought


1. Firewall Shift bushings
2. Brake hard and soft lines
3. Proportioning Valve
4. Wheel Bearings
5. Driveshafts - CV joints
6. Shocks
7. Calipers
8. E-brake cables
9. Drain funnels
User is offlineProfile CardPM
Go to the top of the page
+Quote Post

Posts in this topic


Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



- Lo-Fi Version Time is now: 18th May 2024 - 06:04 PM