Home  |  Forums  |  914 Info  |  Blogs
 
914World.com - The fastest growing online 914 community!
 
Porsche, and the Porsche crest are registered trademarks of Dr. Ing. h.c. F. Porsche AG. This site is not affiliated with Porsche in any way.
Its only purpose is to provide an online forum for car enthusiasts. All other trademarks are property of their respective owners.
 

Welcome Guest ( Log In | Register )

 
Reply to this topicStart new topic
> Hell Hole repair without removing AC lines, possible?
stateofidleness
post Aug 11 2013, 12:20 AM
Post #1


Senior Member
***

Group: Members
Posts: 810
Joined: 1-September 07
From: Canyon Lake, Texas!
Member No.: 8,065
Region Association: None



Fellas,
I've never welded before, but am at the point in the hell hole repair where I can actually start putting metal back in. I have the engine out, all rust cut out (including the old battery tray and support) and need to weld in a new engine shelf and top of the long where hell hole is.

There are two AC lines that come through the sidewall (above battery) that are connected to the compressor. These were fed through grommets in the sidewall and had to have been done prior to "charging" the system.

I carefully placed the compressor on the rear decklid during all of this in the hopes of not having to disconnect these lines (only because I don't know if I can without recharging it).

So.. my question is.. Can I safely weld in new metal in this area without having to remove those two lines? I REALLY don't want to have to hassle with AC stuff after it's all back together. Reason for this is the AC works great and I don't want to mess with a good thing (IMG:style_emoticons/default/smile.gif)

(you can see the two lines near the top by the negative battery cable post)

Attached Image

(the pic below is just a more recent picture of the hell hole area)

Attached Image
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
PancakePorsche
post Aug 11 2013, 12:36 AM
Post #2


Member
**

Group: Members
Posts: 236
Joined: 29-July 11
From: Southern California
Member No.: 13,373
Region Association: None



A feel any good welder could do it no problem since they do not pass through engine shelf. I am always more concerned about rust damage beyond the hell hole. Indeed check for this. I would wrap hoses up with wet rags prior to welding for piece of mind.

I go above and beyond for a Ravenna green car, my favorite !
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
stateofidleness
post Aug 11 2013, 01:20 PM
Post #3


Senior Member
***

Group: Members
Posts: 810
Joined: 1-September 07
From: Canyon Lake, Texas!
Member No.: 8,065
Region Association: None



That sounds like a plan. I guess I'll wrap them up in wet cloth before tacking anything.

For that piece in the top of the long that has the hole in it in the picture, is that piece usually just tacked in around the perimeter in a few places, or is it seam welded the whole way?
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
OllieG
post Aug 11 2013, 04:17 PM
Post #4


OllieG
**

Group: Members
Posts: 212
Joined: 6-July 11
From: UK
Member No.: 13,282
Region Association: England



The top of the Long would have been spot-welded to the inner-wheel-house wall (that the battery tray was fixed to). But I think if you're repairing that top section of the Long, I personally would seam weld it..inch by inch, giving plenty of time for the weld to cool each time. I use compressed air to speed things up a bit..

Recently did the same job myself..
User is offlineProfile CardPM
Go to the top of the page
+Quote Post

Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



- Lo-Fi Version Time is now: 21st May 2024 - 03:07 AM