Ok, I bought the battery tray kit from AA and need to install it. I figured out that i need to bend the engine side tab towards the frame rail and then break it again to get it flat so that i can weld it to the rail. I also am going to drill some holes through the battery tray to weld it to the support bracket.
My question is this. How are you guys attaching the tray to the inner qtr panel? Welding or bolting through? If you weld, where are you welding it etc. I want to get it right the first time.
Thanks for the help.
Rex