Well, it certainly was a long weekend. I'm glad to get back to work, so I can get some rest.
I worked on the /6 this weekend with Pam's help. Accomplished:
- Underside of floorboards scrubbed clean with drill and wire wheel.
- Inside floorboards scraped all the tar and cleaned.
- Painted top and bottom with POR-15.
- Installed Bill Greenway's trunk shock kit.
- Replaced speedo angle drive.
- Rebuilt pedal cluster, painted with POR-15.
- Painted pedal board.
- Replaced bushings in 914/6 throttle linkage.
- Replaced fuel lines with steel in center tunnel, cleaned under the gas tank.
I found a few rust spots... So there's a bit of welding in my future. The bushings in the pedal cluster and throttle linkage were absolutely non-existent. Because of the new bushings, I had to readjust the clutch and throttle. They're still not perfect, but it's driveable. I was just too tired to screw with it anymore.
After all this work, especially to the throttle and pedal cluster, the car drives completely differently.
-Rusty